Supervision of Mansoori Asmari Phase Two Field Development Plan on behalf of PEDEC

In September 2006, PPZ Co. signed a contract with PEDEC for supervision of development project in   Mansoori Oil Field. Mansoori Oil Field is located in Dezful Embayment (Dezful North) and surrounded by Houwr Marsh. Ab-e Teymur and Shadegan are the neighboring fields to Mansoori Field.

A team of expert geologists, geophysicists, petrophysicists, reservoir engineers, production engineers, reservoir simulation engineers and economists supervised this 6 month-long project to a timely completion.