Drilling Supervision for Five Land Rigs on the part of ICOFC

From 2008 to 2010, PPZ Co. was entrusted with Drilling Supervision of 5 land rigs after winning the third tender offered by ICOFC. This project required the participation of a team of 35 specialists from different disciplines. As the number of rigs under supervision were likely to increase to 10, all provisions for a  bigger team were made. The project involved operational drilling supervision and drilling engineering and was completed on schedule.

This project required the participation of a team of 35 specialists from different disciplines. As the number of rigs under supervision were likely to increase to 10, all provisions for a  bigger team were made. The project involved operational drilling supervision and drilling engineering and was completed on schedule.